You can log time that is spent on vacation or sick leave, or for general work like staff meetings, to internal issues. A remaining estimate is not required for internal issues.
Depending on where you log work on an internal issue, you require different permission for the JIRA project that the issue belongs to:
To log work on an internal issue from any timesheet:
In the Log Work window, in the left column, click Internal.
The Log Work window, showing the Internal option in the left sidebar (click to enlarge)
Fill in the requested information.
Tips
Field | Tip |
---|---|
Period | If you select the Period checkbox, an End date field for the time period is displayed. |
Worked | The number of hours that the user worked on the issue. |
Description | A description is optional if the Worklog description is optional checkbox is selected in the Tempo global configuration. |
Vacation planning |