Logging Work from a timesheet

From any timesheet, you can log work done on a Jira issue by clicking Log Work.

Tutorial

(Video without voiceover. Time: 1:47)

Procedure

  1. From any timesheet, in the upper-right corner, click Log Work.
       

      
  2. In the Log Work window, fill in the requested information.

    Tips

    FieldTip
    User

    In the User field, you can select a different user if you have Log Work for Others permission.

    Issue

    In the left column, you can filter the issues that are available in the Issue field. You can select InternalAssignedWatched or Filter.

    Remaining estimateThe remaining estimate depends on the setting 'Remaining estimate is optional' in the Tempo global configuration:
    • If selected and the issue does not have an original estimate, the remaining estimate is not calculated.
    • If selected and the issue has an original estimate, the remaining estimate is reduced by time logged until the remaining estimate is 0, in which case you can increase the remaining estimate. The remaining estimate cannot be a negative number.
    DescriptionA description is optional if the setting 'Worklog description is optional' is selected in the Tempo global configuration.
    Extra fields

    The window might contain extra fields if Tempo work attributes are configured.

        

  3. If you plan to log more work immediately after log this work, click Log another at the bottom of the window.
       
  4. Click Log Work.