This article is for Data Center. Visit Cloud
Structure.Gantt 4.2 Release Notes
6th of June 2024 Structure.Gantt 4.2 introduces Planning Tasks support, and more  |
Download AppÂ
Structure.Gantt on Atlassian MarketplaceÂ
Try Structure.Gantt at Our Demo Server - No Installation or Sign-up RequiredÂ
Version Highlights
Planning tasks support on Gantt charts
Added: Show marker when hovering over the marker's line
Added: Both start and finish dates are now updated on drag-and-drop for tasks without dates
Fixed: Finish date differed in the structure column and TDP when using the 24/7 calendar with a precision of 1 minute
Fixed: Resource leveling progress bar
Fixed: Non-Latin characters were displayed incorrectly on timelines in PDF export
Fixed: Critical path did not highlight the whole chain in some cases
Changes in Detail
Planning tasks on the chart
Planning tasks allow you to plan projects without creating Jira issues - so you can create and adjust tentative plans in Structure (and now Gantt) before committing to them. These tasks can now be displayed and scheduled on a Gantt chart using the same settings as Jira issues.
Planning tasks do not support dependencies.
Supported Versions
Structure.Gantt 4.2 requires Structure 9.0.1 or above.
We support all editions of Jira (Jira Core, Jira Software, Jira Service Management/Service Desk), versions 8.20 or later: this is the last version with 8.20 support, next time 9.4 will be the earliest.
Installation and Upgrade
If you already have production data from a previous version of Structure.Gantt, please back up your database or Jira before upgrading.
Please review your Gantt configurations after upgrading to check that your settings are correct.
Enterprise Deployment Notes
Structure.Gantt 4.2 does not add any changes in terms of stability or performance compared to 4.1. There are no particular special areas of interest for load testing and stress testing. We advise running the same testing procedures as you've done for previous upgrades.