Document toolboxDocument toolbox

This article is for Capacity Planner for Data Center. Visit Cloud

Viewing Unresolved Issues on the Team Timeline

 

  • Team Timeline is a Classic Team Planning feature that was made "Legacy" Feature in Tempo Capacity Planner 7.13.0. Classic Team Planning features are disabled by default for version 7.13.0 and later.

  • Enabling the Classic Team Planning features requires the Tempo Administrator permission.

  • Viewing a team's unresolved issues requires the View Team Plans permission and the Manage Team Plans permission for the team.

You can view a list of unresolved issues in the sidebar of the team members timeline. 

  1. Select Planning   in the Tempo sidebar.

  2. Click … at the top right, and then select Timeline.

  3. Make sure the relevant team is displayed. You can select a team in the team drop-down at the top-left.

  4. The lists of unresolved issues are displayed in a sidebar to the right of the timeline.

  5. Click the different tabs to view the following groupings of unresolved issues:

    1. Backlog - Issues that have been assigned to the team.

    2. Filters - Issues grouped by your favorite Jira filters.

    3. Versions - Issues grouped by unreleased versions of projects that are linked to the team.

    4. Epics - Issues grouped by the following types of unresolved epics:

      1. Epics that have been assigned to the team.

      2. Epics in projects that are linked to the team.

    5. Iterations - Issues grouped by iterations and sprints that are planned for the team.

    6. Issues - The following types of issues:

      1. Backlog issues (see Backlog above).

      2. Issues that belong to projects that are linked to the team.

Tip

  • You can view issues in versions, epics, iterations, and filters by clicking the drop-down arrow for the relevant group.

  • You can open a version, epic, iteration, or filter in Jira by clicking the name in the sidebar.

  • You can open an issue in Jira by clicking the issue key.

  • Team leads can plan time for team members to work on an issue by dragging the issue to the timeline.