You can log time that is spent on vacation or sick leave, or for general work like staff meetings, to internal issues. A remaining estimate is not required for internal issues.
Required permission
Depending on where you log work on an internal issue, you require different permission for the JIRA project that the issue belongs to:
- On any timesheet, you require Work On Issues permission for the project
- On the worklog calendar, you require Browse Projects permission and Work On Issues permission for the project
Procedure
To log work on an internal issue , from any timesheet, complete the following steps:
- On the timesheet, in the upper-right corner, click Log Work.
In the Log Work window, in the left column, click Internal.
The Log Work window, showing the Internal option in the left sidebar (click to enlarge)
Fill in the requested information.
Tips
Field Tip Period If you select the Period checkbox, an End date field for the time period is displayed.
Worked The number of hours that the user worked on the issue. Description A description is optional if the Worklog description is optional checkbox is selected in the Tempo global configuration. - If you plan to log more work immediately after you log this work, at the bottom of the window, select click Log another.
- Click Log Work.
Panel | ||||
---|---|---|---|---|
| ||||
|
Panel | ||||||||
---|---|---|---|---|---|---|---|---|
| ||||||||
Vacation planning
|