Agile Synchronizer Parameters
Synchronize | Choose the mode of operation:
|
Agile Board mode parameters: | |
---|---|
Agile Board | Select the Jira Agile board to synchronize with. The issues matching the Board query will be synchronized. If the structure contains other issues, they will not be affected. |
Synchronize Rank | If checked, repositioning issues in the structure will also change their Rank respectively. Changing Rank in Jira will likewise cause the issue to be repositioned in the structure. |
Synchronize Epics | If checked, placing an issue under an epic in the structure will add it to that epic in Jira. Similarly, if you add an issue to an epic (on the Scrum board or by changing Epic/Theme field of the issue), the issue will be repositioned under that epic in the structure. |
Auto-add sub-tasks | If checked, all sub-tasks of an issue will be added to the structure as well and positioned under the parent issue. |
Custom projects and fields parameters: | |
Projects | Select the Jira project(s) to synchronize with. If the structure contains issues from other projects, they will not be affected. The issues from all selected projects will be synchronized using the same Global Rank field. |
Rank Field | The field of type "Rank" that holds the rank (backlog order) for the selected Project. If you do not wish to synchronize rank, select Don't synchronize. |
Synchronize Epics | If checked, placing an issue under an epic in the structure will add it to that epic in Jira. Similarly, if you add an issue to an epic (on the Scrum board or by changing Epic/Theme field of the issue), the issue will be repositioned under that epic in the structure. |
Auto-add Subtasks | If checked, all sub-tasks of an issue will be added to the structure as well and positioned under the parent issue. |
This synchronizer supports both Import and Export / Resync into/from Structure (more about resync). Incremental synchronization watches both structure changes and Jira changes and applies the change to the other side.
CAREFUL! Please be careful when using this synchronizer, especially when you add multiple issues to the Structure, as this may lead to massive updates in the Agile ranks. There is no "undo" option.
Agile Synchronizer Rules
Common Rules
- Issues that do not belong to the synchronized project(s) are not affected.
- This synchronizer does not add issues to the structure (with two exceptions, explained below). You can use a Saved Filter synchronizer together with an Agile synchronizer to automatically add and position issues.
Sub-Tasks Synchronization
- With the Auto-add sub-tasks mode on, sub-tasks are added to the structure if their parent is in the structure.
- The sub-tasks are forced to stay under their parent. If you move a sub-task somewhere else, it will jump back under the parent again. You can rearrange the order of the sub-tasks, which will be sync'ed to the Agile Rank, if the Rank Field is configured.
Rank Synchronization
- Repositioning issues in the structure causes a Rank change and the repositioning of issues on the Planning Board.
- Rearranging issues on the Planning Board causes the issues to be rearranged in the structure.
When issues are repositioned in the structure according to Rank, they are never moved under a different parent issue.
This restricts the possible rank changes in Jira - you can only move an issue to the position of another issue that is under the same parent issue in the structure; otherwise, the issue will "jump back" later.
Epic Synchronization
- Placing an issue under an epic in the structure will cause its Epic field to change to that epic.
- It does not matter what depth the issue is at in the structure. A sub-sub-sub-issue of an epic issue will still have its Epic field updated.
- If you move an issue in the structure so that it is not under any epic, its Epic field will be cleared.
- If you manually change the Epic field to point to a different epic, the issue will be repositioned under that epic in the structure.
- An issue that has the Epic field pointing to an epic that is in the structure will be automatically added to the structure.
- If you clear the Epic field or change it to point to an epic that is not in the structure, the issue will be moved up in the structure until it is no longer under any epic.
How to Add Issues to Structure Sync'ed with JIRA Agile
When the Agile synchronizer is enabled, it automatically updates the Agile order in background when any Structure change happens. This means that if you carelessly add issues from the sync'ed project to the structure in some random order, their ranks will be updated according to that order.
To add issues to the structure without breaking the existing backlog order:
- If adding manually on the Structure Widget, use a JQL search and add the order by Rank clause to the end of the query, using the rank field that is used by the synchronizer.
- Select the position of the added issues carefully (using drag-and-drop or copy/paste) - the order is likely to change unless you place issues under another issue without any other sub-issues (see Syncing Partial Orders below).
- If using a Saved Filter synchronizer to add issues, add the order by Rank clause to the Saved Filter's query. Note that any issues added by the Saved Filter synchronizer will appear at the end of the structure, and have the lowest ranking.
Syncing Partial Orders
Agile Boards are flat (except for sub-tasks), and the Structure is hierarchical - so it is not possible to precisely rearrange a structure to have all issues come in the same order as they do on the Planning Board, without changing issue parents or making the Structure also flat.
To that end, the structure syncs subsets of the issues in the hierarchy with Agile Rank. For example, consider the following Structure:
A |
|
| B |
| C |
D |
|
| E |
| F |
It is not possible to rearrange the sub-issues so they come in the following order: B, E, C, F - although this is possible on the Planning Board. Instead, the structure will synchronize sub-sets of the issues in the Structure with Jira. The following sub-sets will be synchronized separately:
- A, D - top-level issues: A must come before D on the Planning Board
- B, C - sub-issues of A are sync'ed separately, so B must come before C on the Planning Board
- E, F - sub-issues of D are sync'ed separately, so E must come before F on the Planning Board
In Jira version 6.1 and later, the epics are treated as a separate set of issues, different from Stories and other non-Epics. To accommodate this, Structure updates the rank of issues using a "partial order" approach, syncing epics and non-epics separately. This means that if an epic comes before a Story on the Structure Board, it is not required that they come in the same order on the Scrum Board.